ADU & Garage Conversion — Beverly Hills
Beverly Hills ADU & Garage Conversion | JRD Construction & Development
Thinking about converting a garage into an ADU in Beverly Hills? JRD Construction & Development designs and builds practical, code‑aware ADUs and garage conversions across Southern California. We help homeowners plan for permits, budgets, parking solutions, and utility hookups while minimizing disruption to daily life. Licensed California contractor #1011498. Serving Los Angeles, Pasadena, Glendale, Burbank, Santa Monica, Beverly Hills, Upland, Riverside, Chino, Thousand Oaks, Camarillo, Rancho

What we do for ADU & Garage Conversions
We convert existing garages into comfortable, code‑compliant accessory dwelling units (studio, one‑bedroom, or more). Our approach balances efficient layouts with permitting requirements and long‑term livability.
From initial feasibility to final inspection, our team handles the design coordination, engineering referrals, permit submittals, and the full build—so you get one trusted point of contact.
- Design consultations that account for Beverly Hills zoning and neighborhood context
- Complete permit documents and submittal support
- Structural and energy‑code upgrades where needed
- Turnkey construction: framing, HVAC, electrical, plumbing, finishes
First steps: how to evaluate your garage for conversion
Start with a site visit. We’ll look for constraints such as lot coverage, existing easements, slope, and whether the garage foundation and ceiling height meet ADU standards.
A clear, early scope (kitchen and bath layout, insulation, HVAC plan) keeps pricing predictable and shortens the permit review process.
- Verify zoning, setbacks, and parking requirements with the city
- Measure existing structure, utilities, and ceiling height
- Decide on scope: full conversion, partial addition, or detached ADU
- Create preliminary plan and budget estimate before committing
Permits, inspections, and realistic timeline expectations
Permitting is required and varies by jurisdiction. Beverly Hills has specific local standards that affect submittal requirements and fire‑safety conditions. We prepare permit‑ready plans and coordinate with local inspectors.
We provide a milestone schedule with permit, construction, and inspection windows so you know what to expect at each phase.
- Permits and plan review: 4–8 weeks depending on city workload
- Construction (typical conversion): 8–16 weeks
- Complex projects with structural work: 4–6 months or longer
- Total timeline varies—expect schedule adjustments during permit review and inspections
Common cost drivers and ways to control budget
A clean conversion that reuses the garage footprint and minimizes new foundations is usually the most cost‑efficient path. Identify must‑have features (full kitchen, separate HVAC) vs. nice‑to‑have items.
We present phased options that let you finish essential construction first and add higher‑end finishes later if desired.
- Structural modifications (foundation, new headers) add the most cost
- New bathrooms and kitchens increase plumbing and electrical scope
- Utility upgrades (meter, sewer laterals) can be costly depending on location
- Finishes and appliances scale the final budget—choose priorities early
Frequently asked questions
Do I need permits to convert a garage into an ADU in Beverly Hills?
Most garage‑to‑ADU projects in Beverly Hills require a building permit and a land‑use review. Expect to submit plans showing floor layout, structural changes, plumbing/electrical updates, and compliance with local zoning rules.
How long does a garage conversion to an ADU usually take?
Typical permitting plus construction takes 4–6 months for a straightforward conversion. Complex projects (structural work, new foundations, off‑street parking changes) commonly take 6–9 months. We provide a project schedule during design.
What are the main cost drivers for a garage conversion?
Major cost drivers are: structural work (foundation, raising roof), new utility hookups, bathroom/kitchen installations, and required accessibility or fire‑safety upgrades. Early site inspection reduces surprises and avoids costly late changes.
What site constraints could prevent a garage conversion?
Site constraints include setbacks, lot coverage, ceiling height of the existing garage, slope, and existing utility runs. A site visit will identify whether the garage footprint can stay or if partial demolition and new foundation work are needed.
Ready to discuss your Beverly Hills ADU or garage conversion?
Call JRD Construction & Development at (626) 991‑1887 or email jrdconstruction20@gmail.com to schedule a no‑pressure consultation. Licensed CA contractor #1011498 — we’ll review your site, local code considerations, and a realistic timeline.
6269911887 | jrdconstruction20@gmail.com
Contractor license: 1011498
